Projects
Hub inventory verified
A Comal.News public-records project. Independent of, and not affiliated with, City of New Braunfels.
Public money in context

Projects, districts, and the trails between them

Capital work should not disappear into a vendor total. City payment references now sit beside regional transportation programming, local project applications, permit activity, NBU records, PID assessments, and TIRZ reports.

Programmed transportation
$61.7M
10 City-responsible AAMPO projects
Funding applications
$32.3M
5 call-for-projects submissions · not awards
2026 permits issued
8,085
+2.3% versus the same months
NBU financial records
5
Tracked separately from City GO/CO debt
Payment-to-project trail

Goodwin / Conrads construction sequence

Two June payment applications to Capital Excavation Company share the same project memo and total $3.54M. The City contract list contains other Capital Excavation records, but no shared contract number supports merging them with this project yet.

PA #15$3.03MJun 17PA #16$511.8KJun 25
Regional capital pipeline

Programmed New Braunfels transportation projects

Exact responsible-agency matches from the AAMPO project layer. Project cost is programmed cost—not City spending to date.

Open AAMPO data
FY2025Other

Common St

Construct Continuous 6' Sidewalks and Enhance Crosswalks at Key Intersections.

Liberty Ave → SH 46/SL 337$1.8M
FY2025Other

New Braunfels Citywide Signal Optimization

Update to traffic signal timing at 60 locations across the city.

In New Braunfels at Various Locations$562K
FY2027Other

Dry Comal Crk Hike/Bike Trl

Construct Concrete Shared use Path Along Dry Comal Creek with Separated Crossings Under Railroad and Landa Street.

In New Braunfels from Walnut Avenue → Landa Street$1.6M
FY2027Other

New Braunfels Citywide Pedestrian Improvement

Five project locations with various mobility improvements to include 10-foot shared use path, protected crossings, new sidewalks, and removal of barriers to comply with the American Disabilities Act

In New Braunfels at Various Locations$1.7M
FY2028Other

Barbarosa/Saur Ln

Expand Roadway from 2 to 4 Lanes and Raised Median or Center Turn Lane. Add Shared Use Path and Sidewalks. Drainage and Intersection Improvements. In Comal and Guadalupe Counties

FM 1101 → Saengerhalle Rd$22M
FY2028Other

Solms Road Improvements

Traffic mitigation, pedestrian improvements, and drainage improvements.

In New Braunfels, On Solms Road → from IH 35 SBFR to FM 482$3.2M
FY2028TA/STBG

New Braunfels Bicycle and Pedestrian

Construct Citywide Sidewalks and Shared-Use Paths, ADA Ramps, and Improved Crossings at Intersections. In Comal and Guadalupe Counties

Multiple → Multiple$4.3M
FY2030STBG/CRP

Signal Timing Optimization

Update traffic signal timing plans at intersections citywide

City of New Braunfels → City of New Braunfels$450K
FY2030TA/STBG

San Antonio-Spur

Construct sidewalks and shared-use paths, lighting, ADA improvements, traffic signal and reallocate road space west of Live Oak.

Concepcion Avenue → Walnut Avenue$17.9M
FY2031Other

Gruene Area Multimodal Improvements

Construct complete street elements within Gruene Historic District and surrounding areas including shared use paths, protected crossings, and a 6-foot sidewalk.

In Gruene Historic District SL 337 NBFR → Common St$8.2M

Programmed TIP projects and call-for-projects applications are shown separately. An application is not an award, and programmed cost is not City spending to date.

Development pressure

Monthly permits issued

Counts from the City’s public permit layer; the current month is partial.

Open City GIS
208,557total published permit features7,906prior-year same months
Separate utility ledger

NBU financial and capital records

Community utility finances are relevant to local infrastructure but remain separate from the City debt headline.

Open NBU source

NBU is tracked as a separate community-owned utility/component unit. Utility revenue debt is not added to the City GO/CO headline.

Special districts

Public records grouped by place

These records are published separately by the city; the dashboard makes them navigable as one system.

Programmed projects, applications, permits, payments, contracts, and utility records remain separate record types. The site only joins them when an explicit identifier or reviewed entity relationship supports the connection.